Dragon Energy Park
  • Home
  • News
  • The Project
  • Downloads
  • Links
Feedback
Browsing:

Links

For further information on wind energy and Wales’s policy, please visit:

Wales’s renewable energy targets 

Renewable UK Cymru

Renewable UK

Planning and Environment Decisions Wales  (The project case reference is CAS-01859-K1M7Y6)

For more information on Dragon LNG and the Dragon LNG Solar Farm, please visit: 

Dragon LNG corporate website

Dragon LNG solar farm

Consultation

This public consultation is run by Infinergy Ltd on behalf of Dragon LNG. Infinergy developed the operational Wear Point Wind Farm situated to the east of the site. Infinergy have been appointed by Dragon LNG as their consultants to bring the proposed Dragon Energy wind turbines to fruition.

Latest News

  • Dragon Energy planning application approvedOctober 31, 2024
  • DNS application for Dragon Energy valid and under considerationOctober 16, 2023
  • Dragon LNG starts pre-application consultation for wind turbine plans from Thursday 12 January 2023January 11, 2023

Links

Home

News

The Project

About Dragon LNG

Contact

Freepost Infinergy Ltd
(no further address details or stamps required)

0800 980 4299

i[email protected]

© Copyright 2022 - Dragon LNG
Privacy Policy